Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 29 results ...

Abdalla, A (2007) Meeting housing needs in Libya: towards a responsive owner-built housing with particular reference to Benghazi City, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Agha, R H M (2016) The role of intelligent systems in traditional courtyard houses in Baghdad, Iraq, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Andam, K A (1979) Computer aided design of precast concrete industrial buildings, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Assadi, S O A (1997) An investigation of the records kept by supervisors on construction sites, Unpublished PhD Thesis, Department of Civil Engineering, University of Newcastle upon Tyne.

Beitelmal, J A (1999) Development of appropriate technology road condition monitoring system: Case study of the city of Benghazi in Libya, Unpublished PhD Thesis, Department of Civil Engineering, University of Newcastle upon Tyne.

Chen, Y (2008) Using mobile computing for construction site information management, Unpublished PhD Thesis, School of Architecture, Planning and Landscape, University of Newcastle upon Tyne.

Chritamara, S (2017) An application of the real option framework to large infrastructure projects: evidence for Thailand's transportation system, Unpublished PhD Thesis, Newcastle University Business School, University of Newcastle upon Tyne.

Das, P K (2006) A sustainability impact-assessment tool for selected building technologies in rural India: the case of the Andhra Pradesh primary education project, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Fieldson, R (2007) Towards a framework for sustainability in UK retail architecture, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Ghanbari Parsa, A R (1989) The interaction of planning policies and construction technologies in Iran with reference to China & Japan, Unpublished PhD Thesis, Department of Town & Country Planning, University of Newcastle upon Tyne.

Grifa, M A (2006) The construction industry in Libya , with particular reference to operations in Tripoli, Unpublished PhD Thesis, School of Architecture, Planning and Landscape, University of Newcastle upon Tyne.

Hatmoko, J U D (2008) The impact of supply chain management practice on construction project performance, Unpublished PhD Thesis, School of Civil Engineering and Geosciences, University of Newcastle upon Tyne.

  • Type: Thesis
  • Keywords: architect; client; construction project; construction supply chain; duration; equipment; interview; materials; project performance; simulation; subcontractor; supplier; supply chain management
  • ISBN/ISSN:
  • URL: http://theses.ncl.ac.uk/jspui/handle/10443/617
  • Abstract:
    Construction supply chains encompass the flows of information, materials, labour, plant, equipment and temporary work, which originate from the different parties, viz., main contractors, suppliers, subcontractors and clients/architects. Any problems with these flows will eventually disrupt the project performance. The primary aim of this research was to gain a comprehensive understanding of the impact of supply chain management practice on construction project performance. The research methods adopted comprised: preliminary investigations, a main survey and the development of simulation models. The preliminary investigations were carried out by interviewing members of the construction industry and visiting two medium-sized building projects over a period of 6 months. The main survey was intended to collect data required for developing the simulation models. They were developed using Pertmaster Risk ExpertM software, which allows supply chain delays to be applied on a CPM network of a typical medium-sized building project of 300 days duration. The results of the simulation showed that when all work was carried out by the main contractor and all supply chain delays were applied, the project's median delay was 67 days (equivalent to 22% of the project duration). It was learnt that problems in material flow caused the biggest impact on the project, followed by labour flow, information flow, and `plant, equipment and temporary work' flow. Among the problems in material flow, the biggest impact was due to difficulties in finding materials. When subcontractors were used for the activities that are normally subcontracted, there was a significant reduction of the median delays from 67 to 37 days (equivalent to a 45% reduction). These findings are an important measure of how much supply chain delays may impact on project performance and suggest that problems related to the supply chain in construction are likely to generate significant disruption.

Lopane, F D (2022) Spatial optimisation for resilient infrastructure services, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Mahdjoubi, L M (2001) An investigation of computer generated architectural representations on design decisions taks, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Mashamba, M S (1997) The construction industry in Zambia: opportunities and constraints under the structural adjustment programme and the enabling shelter strategy, Unpublished PhD Thesis, Department of Architecture, University of Newcastle upon Tyne.

McGinty, L N (2020) Business model innovation for green urban infrastructure, Unpublished PhD Thesis, , University of Newcastle Upon Tyne.

Muzir, A K K (2017) School buildings maintenance in Malaysia: Current practices, key challenges and implications, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Riano Cruz, J D (2022) Investigating formation of social capital benefits for value creation and strategy enhancement: the case of SMEs in the UK's construction industry, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Royapoor, M (2015) An investigation into the energy and control implications of adaptive comfort in a modern office building, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Salagoor, J Y (1990) The influence of building regulations on urban dwelling in Jeddah, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Scott, S (1991) Project plans and record-keeping on construction sites in the United Kingdom, Unpublished PhD Thesis, Department of Civil Engineering, University of Newcastle upon Tyne.

Shaaban, S M (2004) A user-centric approach for the development and evaluation of a visual interface to online information in the construction industry, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Shar, B K (2002) Application of it to improve the design process in the construction sector of Pakistan: A case of the specification management process, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Stoyell, J L (2004) Eco-design decision-making: towards sustainable engineering design of large made-to-order products, Unpublished PhD Thesis, School of Civil Engineering and Geosciences, University of Newcastle upon Tyne.

Sun, M (1993) Technology transfer, architectural design and integrated building design systems, Unpublished PhD Thesis, Department of Architecture, University of Newcastle upon Tyne.

Tangtinthai, N (2016) Extraction, use and disposal of construction materials in Great Britain and Thailand, Unpublished PhD Thesis, School of Civil Engineering and Geosciences, University of Newcastle upon Tyne.

Tarhuni, S M (2013) An investigation into the management of knowledge in a historic building conservation organisation in Tripoli, Libya, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Wiguna, I P A (2005) The influence of risk on project performance in Indonesian building contracts, Unpublished PhD Thesis, , University of Newcastle upon Tyne.

Williams, G A (1992) Contract as organisation: an economic analysis of the Joint Contracts Tribunal's Standard Form of Building contract 1980, Unpublished PhD Thesis, Faculty of Law, University of Newcastle upon Tyne.